  • Phuket airport handled around 17.4 million passenger movements in 2025, 39% above its design capacity.
  • The Phase II expansion is intended to increase capacity to 18 million passengers a year by 2030.
  • The planned Andaman International Airport remained at the feasibility and cost study stage.
  • C9 identified seven planned retail projects and an expansion of services on the island.

Infrastructure affects property in a less spectacular way than a beach or a sea view, but often a more lasting one. Air access, travel times, schools, hospitals and everyday services determine whether a given part of the island is convenient outside the holidays too.

The airport is operating above its design capacity

According to C9, Phuket International Airport handled around 17.4 million passenger movements in 2025, despite a design capacity of 12.5 million. This meant operating around 39% above nominal capacity.

The Phase II plan provides for increasing capacity to 18 million passengers a year, expanding aircraft stands and extending the existing runway. The target date given in the report is 2030.

For the property market, greater capacity may support tourism, make connections easier and ease a constraint on the island’s development. It is not, however, an automatic increase in the value of every property. Areas close to the airport may gain in accessibility, but questions of noise, beach quality, infrastructure and user profile remain.

Andaman International Airport: potential, but not yet a done deal

The planned airport in Phang Nga would handle up to 23 million passengers a year and have two runways. In the March 2026 report, however, the project was at the feasibility study and cost analysis stage.

In investment communications, a clear distinction should be drawn between:

  • a completed project,
  • a project under construction,
  • an approved and funded project,
  • a concept or feasibility study.

The price of a property should not rest on the assumption that every announced project will be built on its original schedule.

Roads and transport on the island

Road traffic is one of Phuket’s main problems. C9 pointed to plans for the Kathu-Patong tunnel and a light rail system. Their delivery could improve connections between the airport, Phuket Town and the west coast.

In practice, for a buyer the actual travel time at 5 pm matters more than the general map. A distance of “10 minutes from the beach” presented by a seller may mean considerably more at the height of the season.

Service centres and the changing character of neighbourhoods

The market is developing not only thanks to hotels and the airport. C9 listed seven planned retail projects and the expansion of existing centres. The development of Boat Avenue, Porto de Phuket and facilities around Cherngtalay shows how services can turn a holiday area into a neighbourhood that is convenient for year-round living.

International schools, hospitals, wellness centres and grocery shops can have a similar effect. Long-term rental is more stable where residents can go about their daily lives without driving across half the island every day.

Planning changes: opportunity and risk

The C9 report of March 2026 pointed to changes in height limits and a draft new land-use plan. A higher permitted building density may increase supply and change the views from existing properties. From an investor’s point of view, infrastructure therefore does not only bring benefits: it may also bring more traffic, construction and competition.

How to assess the impact of infrastructure

When analysing a project, it is worth answering five questions:

1. What is the formal status of the infrastructure project? 2. Who is funding it, and what is a realistic timeline? 3. Will it improve everyday access, or only the overall capacity of the region? 4. Could it increase the supply of competing projects? 5. Does the property price already reflect the expected benefits?

Infrastructure can strengthen a location, but it should be one element of the analysis, not the main sales argument.

Sources

  • C9 Hotelworks - Phuket Hotel & Tourism Market Update, March 2026 (Phuket-Hotel-Tourism-Update(1).pdf)
  • C9 Hotelworks - Phuket Property Market Update, May 2025 (Phuket-Property-Market-Update-Report-May-2025.pdf)
  • C9 Hotelworks - Beyond Tourism: How Real Estate Is Redefining Phuket as a World Community, November 2025 (Beyond-Tourism-Phuket-Real-Estate-Forum-2025.pdf)
This material is for information only and does not constitute legal or tax advice or a guarantee of investment performance. The data refer to the periods indicated in the sources and may change.

Discuss your project with Paulina

A free consultation, after which you will receive a clear list of steps.

Book a consultation